2008. Following a 2½ year refit leaving PSS shipyard.

2023. Déjà vu. Following the two-year refit Cariad says farewell to PSS shipyard.

1920. After circumnavigation.

Anchored off Langkawi November 2023
VISIT TO BLUE OCEANIC SHIPYARD FOR QUICK 3-DAY HAULOUT


Cariad in the slings of a brand new 600 ton travel lift.

Cariad in the slings of a brand new 600 ton travel lift.
PORT TAKOLA MARINA, KRABI

Port Takola is a new facility with sufficient water depth to accommodate Cariad’s 3.8 metre draft.

ENGINE ROOM

8LXB Gardner engine

20.5 Kva Kohler genset. Two A/C compressors
TESTING MIZZEN

Rope, rope and more rope

Leathered blocks


Testing mizzen sail alongside dock
LAZARETTE

The lazarette houses misc. equipment

DECKHOUSE TAKING SHAPE




MAIN SALOON

On the surface it still looks messy but lots of finishing work in progress.

On the surface it still looks messy but lots of finishing work in progress.

Finishing work