REPORT #25

PROGRESS REPORT #25

Join Us On The Journey That Has Lasted Over 100 Years

WEEK #40

_________________________________________________________________________

WE ARE PROUD OF OUR MAST BUILDING SHED.

Spars are finished, varnished and paper wrapped ready for rigging.

Trial fit of new spreaders

MOCK-UP OF DECKHOUSE INTERIOR AND EXTERIOR MODIFICATIONS

Original deckhouse construction methods

Quick plywood mock up with raised 8” extra height. Mock up shows proposed window configuration.

Naval architect Paul Spooner’s proposed modification drawings

New step arrangement mock up

Early plans for stern additional cabins

REFURBISHED INTERIOR STEEL WORK READY FOR RE-ASSEMBLY.

PLANKING – A DYING ART

800 plugs required for replaced planking.

MACHINING.

Machining rudder stock couplings.

A BIT OF BRITISH HISTORY

Original Garboard Plank bronze bolts cast in Southampton in 1895.

Original bronze fittings

RUDDER & STEERING GEAR.

Before and after

Preparing for selective copper sheathing

CHECKING KEEL BOLT INTEGRITY.

TANK REFURBISHMENT

Pressure testing

Des Kearns

Cariad Project Manager

Week #40 – 24th October 2022.